Jury Awards $2.27 Million to Man Who Fell Ten Feet When a Stair Handrail Collapsed
After trial: The jury put 5 percent of the fault on Burnett, and Kentucky law reduces his recovery by that share, so this ranks at about $2.16 million net of his fault (decisions rule 15). The Kentucky Court of Appeals affirmed the verdict and liability rulings on September 11, 2009, and sent back only the excluded claim for future prescription expense.
Won by Kaufman & Stigger, PLLC and Other counsel.
A Jefferson County jury awarded Douglas Burnett $2,268,878.20 after he fell from an unfinished commercial staircase in Shelbyville, Kentucky, when a handrail gave way and dropped him ten feet onto concrete. The jury put 80 percent of the fault on the lumber company that supplied and supervised the framing, 15 percent on the general contractor and 5 percent on Burnett. The Kentucky Court of Appeals upheld the liability findings in 2009.
What happened
On December 17, 2002, Douglas Burnett walked through a new 12,000-square-foot office building in the Stonecrest Building Park in Shelbyville, Kentucky. He and his brother Mike owned the construction company running the project, and they had come to talk wiring options with an electrician. No work was under way that day. Framing had been finished and the crew had left about three weeks earlier.
The three men went up to the second floor, talked about dividing the space among prospective tenants, and started back down. Mike and the electrician reached the bottom without trouble. As Burnett came around a landing, he felt as though he had stepped into a hole. He pitched forward into a handrail, which collapsed, and fell face first onto a concrete floor about ten feet below.
The injuries were severe. Burnett broke bones in his face and around his right eye socket, along with other fractures. He suffered a brain injury that left him with a seizure disorder, permanent stacked and double vision, and a loss of peripheral vision in the right eye. He spent two months in the hospital. By the time of trial he was taking eleven pills a day to try to control the seizures.
The building's framing had been sold through a 'turn-key' program run by Boland-Maloney Lumber Company, which agreed to supply the materials and to perform and supervise the framing, stairways included. It subcontracted the labor to Second Framing Corporation but kept its own supervisor on the job. Burnett's lawyers, Thomas H. Hughes and Kerstin Schuhmann of Louisville, argued that the stairway had been framed with seven steps instead of the six on the blueprints. That 'double riser' left one step twice as tall as the rest, contrary to the plans and to the rule that stair risers be uniform. Second Framing was dismissed from the case on summary judgment before trial.
After the jury trial in Jefferson Circuit Court, the jury awarded Burnett $2,268,878.20 and assigned fault 80 percent to Boland-Maloney, 15 percent to Citadel Construction, the general contractor, and 5 percent to Burnett himself. Boland-Maloney's motions for judgment notwithstanding the verdict and for a new trial were denied.
Boland-Maloney appealed, arguing that Burnett needed expert testimony to prove its duty, that it should have been allowed to assign fault to Second Framing, and that several evidence and jury instruction rulings required a new trial. In an opinion issued September 11, 2009, the Kentucky Court of Appeals rejected each argument. It held that the danger of a non-uniform stair riser is apparent even to laypeople, so no expert was needed, and that Second Framing had been found not liable as a matter of law and so could not be blamed at trial.
Sources
This account is drawn from contemporaneous public reporting and the court record.
- 1.Boland-Maloney Lumber Co. v. Burnett, 302 S.W.3d 680 (Ky. Ct. App. Sept. 11, 2009)
- 2.Boland-Maloney Lumber Co. v. Burnett, 302 S.W.3d 680 (Ky. Ct. App. 2009), Caselaw Access Project·Archived copy
- 3.Haugh v. City of Louisville, 242 S.W.3d 683 (Ky. Ct. App. 2007), Caselaw Access Project·Archived copy
- 4.Mayer v. Davis, 991 N.E.2d 116 (Ind. Ct. App. June 21, 2013)
More proven verdicts from Kaufman & Stigger, PLLC
All Kaufman & Stigger, PLLC proven verdicts →A Jefferson County jury awarded $1,200,626 to a Fort Knox Staff Sergeant whose left arm was permanently impaired after an AmeriGas propane delivery truck drifted into his lane and clipped his motorcycle on Blevins Gap Road in September 2005.
A Jefferson County jury took eight minutes to award a retired florist $261,520 after a head-on collision on River Road in Prospect left him trapped in his vehicle and seriously injured, with the verdict coming in a UIM coverage dispute against his own insurer.
Related premises liability verdicts
Anapol Weiss shareholder Kristen Gibbons Feden helped secure $1.6 billion in default verdicts for 104 women sexually abused as children by former Long Island pediatrician Stuart Copperman, one of the largest cumulative civil awards against a single individual in U.S. history.
A Dallas jury awarded $1.1 billion against a trust fund heir who beat a 2-year-old into a permanent vegetative state in 2021, a verdict the firm calls the largest child-assault award in U.S. history.
A Clayton County jury awarded $1 billion to a woman who was raped at age 14 by an armed security guard her employer hired without verifying he was licensed to carry a weapon.
Joseph Bruno and Bruno & Bruno served as lead plaintiffs' counsel in a landmark class action brought by more than 8,000 Gentilly residents exposed to a butadiene tank-car fire in 1987, securing a jury verdict that included $2.5 billion in punitive damages against CSX Transportation alone, later reduced to $850 million on appeal and affirmed by Louisiana's Fourth Circuit.