HomeNew JerseyNagel Rice, LLPProven verdicts$21,000,000 settlement (with employer Mehl Electric and its carriers, reached in September 2021 before the case went to trial against the remaining defendant)
$21,000,000 settlement (with employer Mehl Electric and its carriers, reached in September 2021 before the case went to trial against the remaining defendant)SettlementPaid

Paralyzed Electrical Apprentice Reaches $21 Million Settlement Over Newark Arena Fall

Settlement · Superior Court of New Jersey, Law Division, Essex County · 2021

After trial: The $21 million reported here is the September 2021 settlement with Mehl Electric only and is final; it was not subject to appeal. The claims against Phelps Construction Group that were still pending as of that settlement were later tried: on March 14, 2025, an Essex County jury found total damages of $20,080,976, apportioned 56 percent to Mehl Electric, 36 percent to Phelps, and 8 percent to Dephillips, resulting in a further recovery of $7,229,151 from Phelps and a combined total recovery across both outcomes of about $28.3 million. Bruce Nagel has said he plans to appeal the trial judge's refusal to instruct the jury on the general contractor's nondelegable duty for jobsite safety; the status of that appeal was not confirmed independently as of the most recent source.

Won by Nagel Rice, LLP.

Nicholas Dephillips, a 21-year-old apprentice electrician, fell about 15 feet through a drop ceiling while installing wiring for a helipad atop Newark's Prudential Center in January 2019, fracturing his cervical spine and leaving him paralyzed from the chest down. He sued his employer, Mehl Electric, general contractor Phelps Construction Group, and the arena in Superior Court of New Jersey, Essex County. In September 2021, before trial, he settled with Mehl Electric and its insurance carriers for $21 million, a figure his attorney called the largest construction site accident settlement in New Jersey at the time. His claims against Phelps went to trial in 2025, where a jury apportioned Phelps 36 percent of the liability, adding to his overall recovery from the incident.

What happened

Nicholas Dephillips was 21 years old and working as an apprentice electrician for Mehl Electric when he was sent to install wiring for a helipad being built atop Newark's Prudential Center. In January 2019, he was pulling wire above a drop ceiling on the arena's upper concourse when the ceiling gave way and he fell about 15 feet to the ground below.

The fall fractured his spine in multiple places: a C6 burst fracture with retropulsion, a C7 compression fracture, a T4 endplate fracture, and a posterior ligamentous disruption at C6-7, along with fractures to his left scapula, left sacrum, and ribs. Surgeons performed a C6 corpectomy with decompression, a fusion of C5 through C7, a posterior cervical fusion with instrumentation, and a laminectomy. Dephillips was left paralyzed from the chest down, retaining use of his arms but only limited use of his hands.

Dephillips sued in Superior Court of New Jersey, Essex County, naming his employer, Mehl Electric; the general contractor, Phelps Construction Group; and the Prudential Center. He was represented by Bruce Nagel and Greg Kohn of Nagel Rice.

In September 2021, before the case reached trial, Dephillips settled with Mehl Electric and its insurance carriers for $21 million. Nagel said that, to his knowledge, it was the largest construction site accident settlement in New Jersey up to that point. At the time, the claims against Phelps and the arena remained unresolved.

Those claims went to trial in early 2025. After a month-long trial before Judge Annette Scoca in Essex County Superior Court, a jury returned a total damages figure of $20,080,976 on March 14, 2025. Jurors apportioned 56 percent of the liability to Mehl Electric (already out of the case on account of its settlement), 36 percent to Phelps, and 8 percent to Dephillips. Because Mehl had already settled, Phelps was responsible only for its own share, $7,229,151, bringing Dephillips' combined recovery from the settlement and the verdict to roughly $28.3 million.

At trial, Phelps argued that responsibility for site safety rested with Mehl and with Dephillips himself. Kohn told jurors that Phelps' own safety manual gave its site superintendent control over safety across the job site, and that the superintendent had never spoken with Mehl's crew before they began working near the unsecured ceiling. Nagel said he intends to appeal the judge's refusal to instruct the jury that a general contractor holds a nondelegable duty to enforce safety precautions on its jobsite.

Dephillips needs help from a nurse at home but is able to drive a car and to attend college classes, Kohn said.

Sources

This account is drawn from contemporaneous public reporting and the court record.

More proven verdicts from Nagel Rice, LLP

All Nagel Rice, LLP proven verdicts →
$39 millionVerdictWorkplace InjuryNJ

A Middlesex County jury awarded $39 million on February 1, 2019 to Hussein Agiz, who was 18 when a drag racing car struck his motorcycle inside the Heller Industrial Parks complex in Edison, costing him his right arm and right leg. Jurors had earlier found Heller 40 percent at fault for tolerating years of documented drag racing on its property. The case later settled on appeal for an undisclosed amount.

2019 · Superior Court of New Jersey, Middlesex CountyRead the full story →
$9,750,000 wrongful-death settlement (J. Fletcher Creamer & Son with the NJ Turnpike Authority $4,000,000; Air Brook Limousine $2,900,000; Maitra Associates $2,250,000; DMJM Harris $600,000)SettlementPaidWrongful DeathNJ

Patrick Sweeney, a 34-year-old computer salesman, was killed in August 2006 when the car service driving him to Newark Liberty International Airport lost control on the New Jersey Turnpike near the Route 80 interchange in Bergen County and struck a guardrail that pierced the passenger compartment. His widow, Kristin Sweeney, sued the contractor that built the guardrail, the engineering firms involved in its design and oversight, and the limousine company, arguing the guardrail had not been built to the specifications required by its design. Attorney Bruce Nagel represented the family. After a three-year fight the case settled in 2009 for a combined $9.75 million paid by four defendants, $4 million of it in a settlement with the contractor and the New Jersey Turnpike Authority. A separate, previously dismissed claim against the guardrail's end-terminal manufacturer, Trinity Highway Industries, was not part of the settlement.

2009 · Superior Court of New Jersey, Law Division, Bergen CountyRead the full story →
$1,000,000 judgment (capped by a high-low agreement struck while the jury was deliberating; the jury returned a $6,000,000 verdict)Reduced from $6 millionPaidMedical MalpracticeNJ

A New Jersey jury awarded $6,000,000 after finding that a colorectal surgeon's failure to remove a polyp let a patient's colon cancer go undetected until it had spread to his liver. Benjamin Serico died of the cancer while the case was pending, and his wife Lucia Serico carried it to trial as executrix of his estate. While the jury was deliberating, the parties struck a high-low agreement that guaranteed the family a minimum recovery and capped the surgeon's total exposure at $1,000,000. Because the verdict exceeded that ceiling, judgment entered at $1,000,000. Both the New Jersey Appellate Division and the New Jersey Supreme Court held that the agreement controlled and that no attorney's fees could be added on top of it.

2015 · Superior Court of New Jersey, Law Division, Essex CountyRead the full story →

Related workplace injury verdicts

$742 millionSettlementOH

After nearly 30 years of litigation, Markovits Stock and DeMarco secured a $742 million-plus-interest settlement for approximately 23,000 Navistar retirees whose healthcare and life insurance benefits had been repeatedly reduced.

Markovits Stock & DeMarco2022 · U.S. District Court, S.D. Ohio (Dayton)Read the full story →
$712.5 millionSettlementGroup recoveryNY

Paul Napoli served as court-appointed co-liaison counsel for nearly 10,000 firefighters, police officers, and construction workers who developed respiratory diseases after working at Ground Zero, securing a settlement worth up to $712.5 million against the city and its contractors.

Napoli Shkolnik2010 · S.D.N.Y. (Judge Alvin Hellerstein)Read the full story →
$712 millionSettlementGroup recoveryNY

Sullivan Papain served as court-appointed co-liaison counsel in the World Trade Center Disaster Site Litigation, helping secure a settlement of more than $712 million for roughly 10,000 police officers, firefighters, and construction workers who developed serious respiratory and other illnesses after working in the toxic ruins of the World Trade Center.

Sullivan Papain Block McManus Coffinas & Cannavo2010 · U.S. District Court, Southern District of New YorkRead the full story →
$411,687,387.36 (verdict; on appeal)VerdictReduced after trialLA

Jose Valdivia, 25, was building scaffolding at the Phillips 66 refinery in Lake Charles when a co-worker above him lost his grip on a steel scaffold bar. It struck him on the head and spine through a hard hat and full protective equipment. He is in a wheelchair with limited speech. Brock never reported the accident to OSHA.

Arnold & Itkin2025 · 19th Judicial District Court, East Baton Rouge Parish, LARead the full story →